Warning: include_once (baidu_js_push.php): failed to open stream: No such file or directory in /web/wwwroot/zljituan/www/e/data/tmp/tempnews19_all.php on line 43 Warning: include_once (): Failed opening ' baidu_js_push.php 'for inclusion (include_path ='.: / www / server / php / 53 / lib / php ') in /web/wwwroot/zljituan/www/e/data/tmp/tempnews19_all.php on line 43

HOME> Technical data> The use of reverse osmosis membrane correct method

The use of reverse osmosis membrane correct method
Source: water treatment technology center Author: Zhonglan Release time: 2015-09-01

Also called reverse osmosis, an The pressure difference As the driving force, solvent was isolated from the solution Membrane separation Operation. Of membrane material liquid pressure, when pressure exceeds its osmotic pressure, solvent will reverse the direction of natural penetration for reverse osmosis. Reverse osmosis Also called reverse osmosis, an The pressure difference As the driving force, solvent was isolated from the solution Membrane separation Operation. Of membrane material liquid pressure, when pressure exceeds its osmotic pressure, solvent will reverse the direction of natural penetration for reverse osmosis .

   Storage of membrane element

   -   Membrane element before loading pressure container, do not open the sealed packaging, is stored in a cool and dry place, avoid direct sunlight.

   -   Not cold to freeze.

   The installation of membrane element

   -   Before the installation of membrane element, should guarantee the cleaning system has been completed.

   -   O Ring, strong water sealing ring, can use silicon glue or 50% Glycerin aqueous solution, make is prohibited Membrane element in the loading system, proper lubrication O Ring, strong water sealing ring, can use silicon glue or 50% Glycerin aqueous solution, make is prohibited

Oil, grease, vaseline or oil compounds.

   -   When the membrane element one by one into pressure vessel, by joining in the pressure vessel end plate washer method eliminate clearance, in order to prevent the system

When to start and stop the membrane element began to move in the pressure vessel, at the same time can reduce the possibility of membrane element outside the joint leakage.

   The new film flushing

   -   New system to thoroughly rinse after installation of membrane element, the system of residual impurities, solvent and protection fluid completely clean.

   -   24 Hours. At least rinse water production for drinking 24 Hours.

   Start up and operation of the system

   -   Can be gradually after system start slowly closing thick water valve, make the system to achieve the set recovery. Strong water valve is closed it is forbidden to boot device. Before the system startup, strong water valve should be kept fully open. Can be gradually after system start slowly closing thick water valve, make the system to achieve the set recovery. Strong water valve is closed it is forbidden to boot device.

   -   ( Including the system of pre start-up, normal operation, washing and chemical cleaning ) Do not shut down production of valves on the water pipe. During the system operation, at any time ( Including the system of pre start-up, normal operation, washing and chemical cleaning ) Do not shut down production of valves on the water pipe.

   -   Before the running of the high pressure, low pressure through the soft start institutions or frequency control of motor speed flush to drain the air.

   Pay special attention to

   -   <1.0 NTU or SDI15<5 , feed temperature The < 45 ℃ , into the water does not contain may cause physical and chemical membrane damage of harmful substances. Ensure the water turbidity <1.0 NTU or SDI15 <5 , feed temperature The <45 ℃ , into the water does not contain may cause physical and chemical membrane damage of harmful substances.

   -   0.05mg/L , otherwise will lead to membrane element irreversible oxidative damage. Membrane element of residual chlorine content in the water at any time may not exceed 0.05mg / L , otherwise will lead to membrane element irreversible oxidative damage.

   maintenance

   -   Under the condition of standard system performance degradation 10% , or obviously in scale or fouling occurs, should be cleaned in a timely manner. On a regular basis to clean water washing and chemical dosing can resume the performance of the membrane element, prolong the service life of membrane element. After a period of time in normal operation, the membrane element will be possible to water suspended solids or contamination of refractory material. Under the condition of standard system performance degradation 10% , or obviously in scale or fouling occurs, should be cleaned in a timely manner. On a regular basis to clean water washing and chemical dosing can resume the performance of the membrane element, prolong the service life of membrane element.

   -   5 Day washing system, rinse after close the valve. Stop running system in a short period, should be every 5 Day washing system, rinse after close the valve.
   -   (30 Days or more ) To add 1% Sodium bisulfite solution to prevent bacterial breeding. The system shut down for a long time (30 Days or more ) To add 1% Sodium bisulfite solution to prevent bacterial breeding.