2+3

Henan Zhonglan Environmental Protection Engineering Co., Ltd. specializes in: integrated water purification equipment, groundwater defluorination equipment, well water iron and manganese removal equipment, ultrapure water equipment, valveless filters, pure water equipment, water purification equipment, sewage treatment equipment, Reverse osmosis equipment; environmental protection engineering, construction mechanical and electrical installation engineering construction; sales of water treatment equipment accessories and consumables, laboratory instruments, teaching equipment, telephone 18838160815.
English Set as homepage
Key words:
  • Home
  • Technical Information
  • Water quality standard
  • About Zhonglan
  • contact us
  • current position:

    Home > News

    Three ministries and commissions issued "Three-year Action Plan for Urban Wastewater Treatment to Improve Quality and Efficiency (2019-2021)"

    Source: Author: Time: 2019-05-14 Views: Times

    In order to implement the spirit of the National Eco-Environmental Protection Conference, the Central Economic Work Conference and the deployment requirements of the “Government Work Report”, we will speed up the patchwork of urban sewage collection and treatment facilities, and achieve full coverage, collection, and treatment of sewage pipeline networks as soon as possible The State Council agrees that the Ministry of Housing and Urban-Rural Development, the Ministry of Ecology and the Environment, and the Development and Reform Commission have issued the Three-year Action Plan for Improving Quality and Efficiency of Urban Sewage Treatment (2019-2021) http://euhowblog.com/.

    The plan requires cities to scientifically determine the overall size and layout of domestic sewage collection and treatment facilities , and the capacity of domestic sewage collection and treatment to match the population requirements, economic and social development, and water environment quality improvement requirements of the service area. The planning and construction of the sewage pipe network in the new area should be advanced simultaneously with the urban development, and rain and sewage diversion shall be implemented in all areas except arid areas. http://euhowblog.com/ Clarify the route, land use and scale of construction of sewage pipe network construction in urban villages, old urban areas, and urban-rural junctions, accelerate facility construction, and eliminate blank areas of the pipe network. In areas with excessive population density, villages in cities, etc., it is necessary to strictly control the population and enterprises and institutions to settle in to avoid overloading existing sewage collection and treatment facilities due to the surge in drainage volume. http://euhowblog.com/Implement projects such as mismatched pipe network reconstruction, pipe network update, damage repair and reconstruction, etc., implement pollution removal and shunting, and comprehensively improve the efficiency of existing facilities. If the concentration of BOD in the urban sewage treatment plant is lower than 100mg / L, a “one plant, one strategy” systemic improvement plan should be formulated around the service area pipe network, and the improvement objectives and measures should be clearly defined. Promote the construction of sludge treatment and disposal and sewage recycling facilities. In areas with small populations, relatively scattered areas, or areas not covered by the municipal pipe network, scattered sewage treatment facilities should be constructed according to local conditions. The original text is as follows:
    Three-year Action Plan for Urban Wastewater Treatment to Improve Quality and Efficiency (2019-2021)
    Three-year Action Plan for Urban Wastewater Treatment to Improve Quality and Efficiency (2019-2021)
    Three-year Action Plan for Urban Wastewater Treatment to Improve Quality and Efficiency (2019-2021)
    Three-year Action Plan for Urban Wastewater Treatment to Improve Quality and Efficiency (2019-2021)
    Three-year Action Plan for Urban Wastewater Treatment to Improve Quality and Efficiency (2019-2021)
    Three-year Action Plan for Urban Wastewater Treatment to Improve Quality and Efficiency (2019-2021)
    Three-year Action Plan for Urban Wastewater Treatment to Improve Quality and Efficiency (2019-2021)
    Three-year Action Plan for Urban Wastewater Treatment to Improve Quality and Efficiency (2019-2021)
    Three-year Action Plan for Urban Wastewater Treatment to Improve Quality and Efficiency (2019-2021)
    Three-year Action Plan for Urban Wastewater Treatment to Improve Quality and Efficiency (2019-2021)
    Three-year Action Plan for Urban Wastewater Treatment to Improve Quality and Efficiency (2019-2021)
    0

    Phone: 0371-63916789 Mobile: 188 3816 0815 QQ: 2473990570 Fax: 0371-55623698 Email: zljituan88@163.com

    Office Address: 910, 9th Floor, Building No. 6-B, West Fourth Ring Road, Zhengshang Road, Zhongyuan District, Zhengzhou City Factory Address: Block C, South Food Machinery Industrial Park, Jinfeng Avenue, Xiping County, Zhumadian, Henan Province

    Overseas Business Department (Pakistan) 00923434039999 008613838581116 Islamabad Office: Pakistan, Islamabad, F7 / 4, 60th Street, 1

    Henan Public Security No. 41010202002010